So this is how it looks as the builders take a week off for Christmas and New Year. The rear, ground floor facade has altered a fair bit in the last week with the two back doors, a window and an l-shaped window all now blocked in. Bi-fold doors replace the two remaining windows, so in the summer we'll be able to open up the doors from both the kitchen and the playroom onto the garden. It doesn't look attractive as it is, but once the windows are all replaced it should look much less cluttered than it did.
The new supporting column. This was necessary to support the roof, which is currently resting directly on the window and would probably have collapsed if the window was taken out without this extra support.
Inside the main house, a drain for the damp coursing. The walls have been built up in preparation for the insulation which will be added next month. Although the main house is still definitely
en obra work should pick up pace there in January as it's actually less work that the guest cottage which was totally rebuilt.
The guest cottage is shaping up well and today the guys were finishing placing the plaster boards over the top of the insulation. It's already pretty toasty in there, even without heating, so hopefully this was all worth it and it will require minimal heating to keep it really warm even during the cold winter months.